Beaver ConceptsDesign & Build

Design and Build Company in Kenya

One team, one contract, one set of answers

Design and build means one firm takes responsibility for the architectural design, engineering, costing and construction of your project under a single contract. Beaver Concepts delivers this for homeowners, developers and businesses in Nairobi and the surrounding counties, with the drawings, bill of quantities and build programme prepared together rather than one after the other.

Modern house with a timber-clad entrance volume and concrete walls

What design and build means in practice

On a conventional project you appoint an architect, then engineers, then a quantity surveyor, and finally tender the work to a contractor. Each party works from the previous party's output, and problems tend to surface late: a beam that clashes with a duct, a specification the budget cannot carry, a drawing set the builder reads differently from the designer.

Under design and build, the architect, structural and MEP engineers, quantity surveyors and site team work as one unit from the first sketch. Cost is tested while the design is still cheap to change, services are coordinated before the drawings are issued, and the people who draw the building are the people who answer for how it is built.

Design and build compared with separate appointments

Neither route is right for every client. The table sets out where they differ so you can choose with the facts in front of you.

Design and build versus separate consultant and contractor appointments
ItemDesign and buildSeparate appointments
Contracts to manageOneOne per consultant, plus the contractor
Who coordinates architecture, structure and servicesThe design and build teamYou, or a lead consultant you pay separately
When cost is testedDuring design, alongside the BOQOften only at tender, after the design is complete
ProgrammeDesign, approvals and site preparation overlapEach stage waits for the last
Accountability if parts of the design conflictOne firmShared between parties, sometimes disputed
Independent check on cost and qualityNeeds to be arranged deliberatelyBuilt in through the independent consultants
The trade-off is independence. We address it by issuing a fully priced bill of quantities that you can have reviewed by any quantity surveyor you choose.

Who it suits

Design and build works best for clients who want a single point of accountability: first-time homeowners building a bungalow or maisonette, developers delivering apartments or rental units to a programme, and commercial clients fitting out or extending premises against a fixed handover date.

It is also the practical choice for Kenyans building from the UK, the US, Canada or the Gulf. You cannot be on site to referee between a consultant and a contractor, so having one team hold the drawings, the budget and the site is a real advantage. Regular progress reports and staged payments tied to completed work keep you informed without needing to be in Nairobi.

Approvals and registration

Building in Kenya involves several regulators. Architectural and quantity surveying work is registered through BORAQS, engineering through the Engineers Board of Kenya, and construction contractors through the National Construction Authority. Building plans need county government approval before work starts, and larger developments may also need environmental approval from NEMA.

We prepare and submit the approval set as part of the design stage, so the county requirements are built into the drawings from the start rather than retrofitted.

How design and build works with us

  1. Stage 01

    Brief and site review

    We confirm your needs, budget, timeline and site constraints, including ownership documents, access, ground conditions and available utilities.

  2. Stage 02

    Concept design and budget alignment

    Concept drawings are prepared alongside an early cost estimate, so the design and the budget are tested against each other before either is fixed.

  3. Stage 03

    Approval drawings

    We prepare the architectural and structural drawings required for county submission and manage the approval process.

  4. Stage 04

    Engineering and bill of quantities

    Structural and MEP designs are completed and coordinated, and a full bill of quantities is priced so you know the cost before signing a build contract.

  5. Stage 05

    Contract and construction

    Work starts on site under a single contract, with a programme, staged payments tied to completed work, and regular photographic progress reports.

  6. Stage 06

    Handover and defects period

    You receive as-built information and operating guidance for the systems installed, and defects that appear during the agreed period are put right.

What you receive

  • Written project brief and site review notes
  • Concept drawings and, where useful, 3D views
  • County approval drawing set, prepared and submitted
  • Structural and MEP design drawings, coordinated
  • Fully priced bill of quantities
  • Construction programme and stage-payment schedule
  • Regular site progress reports with dated photographs
  • Handover pack with as-built information and system guidance

Questions we are often asked

What is design and build?

Design and build is a procurement route where one firm is responsible for both the design and the construction of a project under a single contract. It gives you one point of accountability instead of separate contracts with architects, engineers, quantity surveyors and a contractor.

Is design and build more expensive than hiring separately?

Not inherently. The total cost depends on the specification, not the procurement route. What changes is when you find out the cost: with design and build the bill of quantities is prepared alongside the design, so you can adjust the scope before you commit to construction.

Can I still get an independent opinion on the price?

Yes, and we encourage it. We issue a fully itemised bill of quantities, and you are free to have an independent quantity surveyor review it. Beaver Concepts also offers construction cost audits as a separate service.

Can I manage a design and build project from abroad?

Yes. With one team holding the drawings, budget and site, there is less for you to coordinate remotely. Decisions are made from drawings and reports, and payments are released against completed stages.

Who handles county approvals?

We prepare and submit the approval drawings as part of the design stage. Timelines depend on the county and on the completeness of your ownership documents, so we check those early.

What do I need to have before I start?

Proof of ownership of the plot, such as a title deed or lease, an approximate budget, and a rough idea of the accommodation you need. If you do not have all of this yet, we can start with a site review and a feasibility estimate.

Last updated 29 September 2026

Tell us about your project.

Share your plot, brief and budget. We reply with clear next steps and a written fee or cost proposal.